- Test & Measurement
-
Analyzers
-
Oscilloscope
-
Meters
-
Generators
-
DC Power Supply
-
Optical Communications
-
Other Test Equipment
-
Accessories
-
Probes
-
Software
-
AC Power Sources
-
Accessory Kits
-
Amplifiers
-
Antenna
- View All Categories >>
-
- Semiconductor & PCB
-
Front End
-
Back End
-
PC Board Assembly
- View All Categories >>
-
- Surplus & Liquidation
- Computers & Electronics
- Construction
-
Aggregate Equipment
-
Air Compressors
-
Asphalt / Pavers / Concrete Equipment
-
Compactors
-
Cranes
-
Crawler Loaders
-
Dozers
-
Drills
-
Dumpers
-
Excavators
-
Forestry Equipment
-
Forklifts
-
Generator Sets
-
Lifts
- View All Categories >>
-
- Biotech & Life Sciences
-
Biotechnology
-
Cell Counters
-
DNA Sequencers
-
DNA Synthesizers
-
Densitometers
-
Electrophoresis
-
Electroporation
-
Fermenters / Bioreactors
-
Flow Cytometers
-
Gel Dryer
-
Hybridization Ovens/Incubators
-
Immunoassay Systems
-
Microarray Scanners
-
Microplate Dispensers
- View All Categories >>
-
- Machinery
-
Abrasives
-
Air Compressors
-
Air Cooling & Heating Equipment
-
Bar Machinery
-
Bending & Forming Equipment
-
Boring Mills
-
Broaching Machines & Keyseaters
-
CNC Machinery
-
Chemical & Processing Equipment
-
Chip, Recycling & Scrap Equipment
-
Cleaning, Painting & Washing Equipment
-
Coil Processing Equipment
-
Construction Equipment
-
Die Casting Machines
- View All Categories >>
-
- Commercial Trucks
-
Heavy Duty Trucks
-
Medium Duty Trucks
-
Light Duty Trucks
-
Trailers
- View All Categories >>
-
- Chemical Equipment
-
AGITATORS
-
AIR FIN COOLERS
-
BLENDERS
-
BLOW MOLDERS
-
BLOWERS
-
BOILERS
-
CENTRIFUGES
-
COLUMNS
-
COLUMNS DBL DIA
-
COMPLETE PLANTS
-
COMPRESSORS
-
CONVERTERS
-
CONVEYORS
-
COOLING TOWERS
- View All Categories >>
-
- Apparel and Textile
-
Textile Machinery
-
Apparel & Textile Machinery Parts
-
Apparel Machinery
-
Home Textile Product Machinery
-
Apparel Accessories Machinery
-
Leather Production Machinery
- View All Categories >>
-
- Medical Equipment
-
Beds, Stretchers and Furniture
-
Cardiology
-
Consumables and Supplies
-
Cosmetic
-
Defibrillator
-
Dental
-
EMS/Rescue
-
Endoscopy
-
Exam Room
-
Homecare/Rehab
-
Imaging
-
Laboratory
-
Monitors/ICU/CCU
-
Neonatal
- View All Categories >>
-
- Printing Equipment
-
Press
-
Prepress
-
Postpress
-
Guillotines
-
Packaging
-
Misc
-
Flexo Printing
-
Web offset
-
Screen Printing
-
Package deals
-
Spare Parts
- View All Categories >>
-
- Packaging Equipment
-
Accumulators
-
Bag Dumps
-
Bag Sealers
-
Bagging Machines
-
Blister Packaging Lines
-
Blister Packers
-
Blister Sealers
-
Blow Fill Seal
-
Bottle Rinsers
-
Canning Equipment
-
Cap Sorters
-
Cappers
-
Cartoners
-
Case Erectors
- View All Categories >>
-
Approvals granted for Cambridge development
04/22/2013 01:08:25
Work is to start at the UK's Cambridge University on the first phase of the North West Cambridge development, following approval by the University’s governing body, Regent House.
Outline planning permission was granted in August 2012 for a mixed-use development on the 150ha site of University-owned farmland. The approval was subject to the signing of a local planning authority agreement, planning conditions and other approvals.
Phase one of the development will now go ahead and will include 530 homes for qualifying university and college staff, 450 homes for sale, accommodation for 300 students, a local centre and community facilities, and much of the site infrastructure, which will enhance connections to and within the local area.
Roger Taylor, project director of the North West Cambridge Development, said, “North West Cambridge is the largest development in the country to be built to the Code for Sustainable Homes Level 5 and BREEAM Excellent for other uses.
"The ambition to create a low-carbon community incorporates a green travel plan and energy and utilities systems - the development will be an exemplar of sustainable living.”
Subject to further approvals by the local planning authorities, work on Phase one will start later this year with the first buildings scheduled for completion in 2015.
Phase one is estimated to cost £281 million (€330 million), with the scheme in its entirety costing £1 billion (€1.15 billion).
The total project will include 1,500 homes for university staff, accommodation for 2,000 students, 50,000m2 of academic facilities, 100,000m2 of research and development space, 1,500 private houses for sales, community facilities such as school and shops, a hotel, and a sustainable transport provision including cycle ways.

