Sorry, the search criteria can not be empty
Search
View All Categories
Seasonal Sale! As usual see

Pre-Engineered Air-Blast Booths comply with OSHA and EPA

05/08/2013 05:52:12

At 10 ft high, Pre-Engineered Booths (PEBs) strip large parts while reclaiming media, removing dust, and breathing fresh air into work enclosure. Booths do not require welding or excavation and are constructed with 14 gauge wall and ceiling panels. Pneumatic blast and recovery system combines pressure-blast hardware with media-reclamation system, producing 47 in. of static pressure. Standard features include double-swing work doors, interior lighting, and accessible electrical controls.