- Test & Measurement
-
Analyzers
-
Oscilloscope
-
Meters
-
Generators
-
DC Power Supply
-
Optical Communications
-
Other Test Equipment
-
Accessories
-
Probes
-
Software
-
AC Power Sources
-
Accessory Kits
-
Amplifiers
-
Antenna
- View All Categories >>
-
- Semiconductor & PCB
-
Front End
-
Back End
-
PC Board Assembly
- View All Categories >>
-
- Surplus & Liquidation
- Computers & Electronics
- Construction
-
Aggregate Equipment
-
Air Compressors
-
Asphalt / Pavers / Concrete Equipment
-
Compactors
-
Cranes
-
Crawler Loaders
-
Dozers
-
Drills
-
Dumpers
-
Excavators
-
Forestry Equipment
-
Forklifts
-
Generator Sets
-
Lifts
- View All Categories >>
-
- Biotech & Life Sciences
-
Biotechnology
-
Cell Counters
-
DNA Sequencers
-
DNA Synthesizers
-
Densitometers
-
Electrophoresis
-
Electroporation
-
Fermenters / Bioreactors
-
Flow Cytometers
-
Gel Dryer
-
Hybridization Ovens/Incubators
-
Immunoassay Systems
-
Microarray Scanners
-
Microplate Dispensers
- View All Categories >>
-
- Machinery
-
Abrasives
-
Air Compressors
-
Air Cooling & Heating Equipment
-
Bar Machinery
-
Bending & Forming Equipment
-
Boring Mills
-
Broaching Machines & Keyseaters
-
CNC Machinery
-
Chemical & Processing Equipment
-
Chip, Recycling & Scrap Equipment
-
Cleaning, Painting & Washing Equipment
-
Coil Processing Equipment
-
Construction Equipment
-
Die Casting Machines
- View All Categories >>
-
- Commercial Trucks
-
Heavy Duty Trucks
-
Medium Duty Trucks
-
Light Duty Trucks
-
Trailers
- View All Categories >>
-
- Chemical Equipment
-
AGITATORS
-
AIR FIN COOLERS
-
BLENDERS
-
BLOW MOLDERS
-
BLOWERS
-
BOILERS
-
CENTRIFUGES
-
COLUMNS
-
COLUMNS DBL DIA
-
COMPLETE PLANTS
-
COMPRESSORS
-
CONVERTERS
-
CONVEYORS
-
COOLING TOWERS
- View All Categories >>
-
- Apparel and Textile
-
Textile Machinery
-
Apparel & Textile Machinery Parts
-
Apparel Machinery
-
Home Textile Product Machinery
-
Apparel Accessories Machinery
-
Leather Production Machinery
- View All Categories >>
-
- Medical Equipment
-
Beds, Stretchers and Furniture
-
Cardiology
-
Consumables and Supplies
-
Cosmetic
-
Defibrillator
-
Dental
-
EMS/Rescue
-
Endoscopy
-
Exam Room
-
Homecare/Rehab
-
Imaging
-
Laboratory
-
Monitors/ICU/CCU
-
Neonatal
- View All Categories >>
-
- Printing Equipment
-
Press
-
Prepress
-
Postpress
-
Guillotines
-
Packaging
-
Misc
-
Flexo Printing
-
Web offset
-
Screen Printing
-
Package deals
-
Spare Parts
- View All Categories >>
-
- Packaging Equipment
-
Accumulators
-
Bag Dumps
-
Bag Sealers
-
Bagging Machines
-
Blister Packaging Lines
-
Blister Packers
-
Blister Sealers
-
Blow Fill Seal
-
Bottle Rinsers
-
Canning Equipment
-
Cap Sorters
-
Cappers
-
Cartoners
-
Case Erectors
- View All Categories >>
-
Manitowoc 7000 Aids in Mississippi River Bridge Construction
06/02/2013 21:58:40
A Manitowoc 7000 is aiding in the construction of a cable-stayed bridge in St. Louis, Mo., that will span the Mississippi River. The 350-ton capacity crane is being used to construct two towers that will support the bridge.
The Manitowoc 7000 is pedestal-mounted on a 93-foot by 195-foot barge. It is being used to lift preassembled rebar cages into place. The cages will form the base for the two 406-foot towers that will support the bridge. The crane will perform over 70 rebar cage lifts, weighing from 45,000 pounds to more than 100,000 pounds.
The crane is currently configured with 325-feet of main boom and a 60-foot jib. As the project progresses, the crane will be reconfigured with 400-feet of main boom and 60-feet of jib to provide a tip height of 460 feet.
Massman Construction, Kansas City, Mo., owns and operates the Manitowoc 7000. Massman is the lead contractor in a joint venture, which includes Traylor Brothers, Evansville, Ind., and Alberici Constructors, St. Louis, Mo.
Dale Helmig, project manager for Massman Construction, says that having a large-capacity crane available will help them stay on schedule throughout the construction process. “The Manitowoc 7000 saves us time,” he says. “There would be no way we could meet the schedule without preassembling these rebar cages.”
After the towers are complete, the Manitowoc 7000 will be used in conjunction with other Manitowoc crawler cranes on the project to lift the field sections into place for the bridge span. These sections measure 50 feet long by 94 feet wide and weigh 200,000 pounds.
Other Manitowoc crawlers on the project include two Manitowoc 2250s, a Manitowoc 4100W and a Manitowoc 4000W. One of the 2250s, configured with 250 feet of main boom, is being used to pour concrete on one side of the river while the 4100W is pouring concrete on the other side of the river. The other 2250 is configured with a 210 feet main boom and is being used as a support crane on the project.
The $229 million Mississippi River Bridge project is a new four-lane bridge crossing the Mississippi River connecting downtown St. Louis and southwestern Illinois that, when complete, will be part of Interstate 70. With a 1,500-foot main span, it will be the third-largest cable-stayed bridge in the United States. The bridge will be open to traffic in 2014.